Application Turnout in ballast – depot Length of track: 90 turnouts Material used: Switch sleepers 13x24 cm Country: Austria Project location: Vienna – Erdberg Owner: Wiener Linien
In 2012, Wiener Linien decided to replace old wooden sleepers with new FFU switch sleepers in all points at the Erdberg depot. Approx. 90 switches were given FFU sleepers, since the tracks of the existing switches were still in good condition, they were retained. According to a feasibility study, FFU made it possible to save a lot compared to installing switches on concrete sleepers.