Steel Bridge, Kareta Api, West Java, (Indonesia)

Area of application: Bridge
Length of track: Approx. 300m
Material used: FFU sleeper
Country: Indonesia
Project location: Bandung, West Jaya Province
Owner: PT. Kereta Api Indonesia

In Indonesia, the service life of wooden sleeper is around 10 years in general due to its high temperature and humidity so the railways need to replace the bridge sleepers frequently even though the work in high places is very dangerous and costly. Longer service life by FFU Synthetic Railway Sleepers can achieve the significant reduction of replacement work along with better stability and safeness of the track.

Go back



There are no items matching your search.

Stay up to date!
Subscribe to our newsletter and follow us on LinkedIn.

Copyright © SEKISUI CHEMICAL GMBH 2024.
You are using an outdated browser. The website may not be displayed correctly. Close