Area of application: Bridge/ FFU walking deck Length of track: approx. 10m Material used: FFU Sleepers and FFU walking deck Country: Japan Project location: Komagome Station, Yamanote-Line, Tokyo Owner: JR East
Due to the wide range of adjustment options, FFU sleepers offer ideal solutions, as in this case with bridges. Especially due to the possibilities of the individual assembly of add-on parts, such as covers, guide rails, cable guides, etc. In addition, the FFU synthetic sleepers offer a durable solution due to the very long service life.