Bridge Chiswick Park, London (UK)

Application: Steelbridge
Length of track: Approx. 40 m
Material used: longitudinal bearer (LBB)
Country: United Kingdom
Project location: Chiswick Park, London
Owner: London Underground

On London Underground’s eastbound Piccadilly line at Chiswick Park, underbridge D70 was the site chosen for replacement of life-expired softwood longitudinal bearers with Sekisui FFU®. Five longitudinal bearer frames are spliced together at chamfered overlaps. All frame components – longitudinal bearers, transoms and positive conductor rail blocks – are Sekisui FFU. Materials were supplied in pre-ordered lengths and then machined and prefabricated in panels by London Underground Track Manufacturing Division (TMD).

Go back



There are no items matching your search.

Stay up to date!
Subscribe to our newsletter and follow us on LinkedIn.

Copyright © SEKISUI CHEMICAL GMBH 2024.
You are using an outdated browser. The website may not be displayed correctly. Close