Double-Crossing, Network Rail, Newark (United Kigdom)

Application: Special Projects
Length of track: 1 double-crossing
Material used: 8 Beams 16 m long, 710 mm wide and 350 mm high.
Country: United Kigdom
Project location: Newark
Owner: Network Rail

Replacement of a critical flat crossing on Network Rail’s East Coast Main Line required the development of the longest ever FFU synthetic bearers. These bearers are 16 m long, 710 mm wide and 350 mm high.

Situated just north of Newark Northgate station, the flat crossing is located where the east-west Nottingham – Lincoln line crosses the ECML. It is one of the most complex structures on the route, with no fewer than 16 crossing noses. Carrying 160 km/h inter-city trains running north-south and heavy freight traffic on the east-west line, the trackwork on the crossing has had to be replaced every 15 years.

Various teams from Network Rail including Infrastructure Projects, Safety Technical & Engineering and Route Asset Management, worked with Progress Rail, Sekisui Chemical, the Central Rail Systems Alliance and the S&C North Alliance to develop, manufacture and install Sekisui’s new Fibre Reinforced Form Urethane (FFU) bearers. These have all the workable properties of hardwood and an expected life of 50 years.

Go back



There are no items matching your search.

Stay up to date!
Subscribe to our newsletter and follow us on LinkedIn.

Copyright © SEKISUI CHEMICAL GMBH 2024.
You are using an outdated browser. The website may not be displayed correctly. Close